US 24: Bridge construction from Meridian Rd to S 150 E (MM 7.6 to MM 7.7, 2m E of Kentland). Until 4/30/2025 at 7:00PM CDT. Construction work. Contract B-43143: DES #2000818 on US24, 3.04 miles east of US41. The road is currently open to traffic. Expect… https://t.co/txPXu05xCm
US 24: Road construction from W 25 S to US 421; IN 43 (MM 34 to MM 35.1, near Reynolds). Until 3/21/2025 at 7:00PM EDT. Single line traffic - alternating directions. White County B -41024 US 24, between W 25 S and US 421; IN 43 (near Reynolds). Road… https://t.co/j13ydLXztw
IN 43: Width limit in effect from Railroad St to US 421; US 24 (MM 46.2 to MM 46.5, Reynolds). Until 4/30/2025 at 11:59PM EDT. Width limit 14'0". US 24 closed between SR43/US421 and Main Street in Reynolds, IN for road reconstruction. Traffic… https://t.co/iQVyPWvgD4