>>
US Route 501 >>
Accident Today
US 501 Accident Reports
US 501 Live Traffic Cams
More results in our US 501 Archives
DOT Accident and Construction Reports
-
TYPE: Accident Serious
-
The road Road is closed at E 3rd Street.
Road ClosedTYPE: Construction Moderate
-
TYPE: Construction Serious
-
Road closed for the removal and replacement of West 2nd Street bridge over Lumber River. T
Road ClosedTYPE: Construction Serious
-
TYPE: Construction Moderate
-
TYPE: Accident Serious
-
The road Road is closed near US 74.
Road ClosedTYPE: Construction Moderate
-
The section of SR 1005 Tolarsville Rd between the intersection of SR 1924 Barker Ten Mile
Road ClosedTYPE: Construction Moderate
-
TYPE: Construction Moderate
-
Weight Limit on Parkton Tobermory Rd. Bridge over I-95 (North of St. Pauls) has been cha
Road ClosedTYPE: Construction Moderate